Service

Electric Vehicle Systems

Restabat ut Caesar post haec properaret accitus et abstergendae causa suspicionis sororem suam, eius uxorem, Constantius ad se tandem desideratam venire multis fictisque blanditiis hortabatur. quae licet ambigeret metuens saepe cruentum, spe tamen quod eum lenire poterit ut germanum profecta, cum Bithyniam introisset, in statione quae Caenos Gallicanos appellatur

  • HV busbar terminals up to 250 A
  • HVIL interlock integration
  • Touch-safe finger protection
  • IP67 / IP6K9K sealing
Electric Vehicle
profile

High-voltage Connection System

Against the backdrop of the rapid development of the electric vehicle industry, connectors serve as the hubs for signal and energy transmission within the vehicle's "three electric systems" (battery, motor, and electronic control); consequently, their reliability directly impacts vehicle safety and performance.

  • Anti-tracking design
  • Arc resistance and thermal management
  • High-voltage withstand capability
  • HV Busbar Terminals Up to 250 A

    Itaque verae amicitiae difficillime reperiuntur in iis qui in honoribus reque publica versantur;

  • HVIL Interlock Integration

    Itaque verae amicitiae difficillime reperiuntur in iis qui in honoribus reque publica versantur;

  • Touch-safe Finger Protection

    Itaque verae amicitiae difficillime reperiuntur in iis qui in honoribus reque publica versantur;

  • IP67 / IP6K9K Sealing

    Itaque verae amicitiae difficillime reperiuntur in iis qui in honoribus reque publica versantur;

In-House Capability

Everything Under One Roof

Tooling, stamping, molding and assembly all sit in the same building in Jiading. Nothing is subcontracted — which is why the tolerance holds.

  • 0.001MM
    ACHIEVED TOLERANCE

    Mold & Die Making

    Wire EDM, sinker EDM, jig grinding and high-speed CNC — every tool built and maintained in-house.

  • 1500SPM
    Stamping speed

    Precision Stamping

    Progressive dies running copper alloy strip, with in-line vision inspection on every hit.

  • 120T
    Max clamping force

    Injection Molding

    Insert molding and micro-molding on engineering thermoplastics, with fully automated take-out.

  • 1.55B
    Parts / year capacity

    Automated Assembly

    Vision-guided assembly cells with 100 % in-line inspection and barcode traceability.

Projects

Real Customer Case

  • Itaque Verae Amicitiae Difficillime Reperiuntur In Iis Qui In Honoribus Reque Publica

    Restabat ut Caesar post haec properaret accitus et abstergendae causa suspicionis sororem suam, eius uxorem, Constantius ad se tandem desideratam venire multis fictisque blanditiis hortabatur.

    Get a Quote
    • 99.9%

      accuracy achieved

    • 85%

      less heat failure

    • 85%

      lower resistance

  • Itaque Verae Amicitiae Difficillime Reperiuntur In Iis Qui In Honoribus Reque Publica

    Restabat ut Caesar post haec properaret accitus et abstergendae causa suspicionis sororem suam, eius uxorem, Constantius ad se tandem desideratam venire multis fictisque blanditiis hortabatur.

    Get a Quote
    • 99.9%

      accuracy achieved

    • 85%

      less heat failure

    • 85%

      lower resistance

  • Itaque Verae Amicitiae Difficillime Reperiuntur In Iis Qui In Honoribus Reque Publica

    Restabat ut Caesar post haec properaret accitus et abstergendae causa suspicionis sororem suam, eius uxorem, Constantius ad se tandem desideratam venire multis fictisque blanditiis hortabatur.

    Get a Quote
    • 99.9%

      accuracy achieved

    • 85%

      less heat failure

    • 85%

      lower resistance

How We Work

Drawing to Production, in Five Steps

The APQP framework, applied to every programme — whatever the volume.

  • 01

    Feasibility

    DFM review on tolerances, plating, moldability and terminal geometry.

    48 HOURS
  • 03

    Design & Quote

    3D design, tooling concept and a fixed price for mold and unit cost.

    5 days
  • 03

    Tooling

    Mold and stamping die cut
    in-house on our own EDM and CNC lines.

    25 days
  • 04

    First Article

    T1 samples with a full CMM dimensional report and material certificates.

    7 days
  • 05

    PPAP & Ramp

    PPAP submission, then ramp-up on automated assembly with SPC in place.

    Series
Related

Related Application Products

Explore More